Applying for a Building Permit for a Knock-Down House

Published 10 Mar 2025 · Updated 2 Sept 2026 · 5 min read

รูปบทความการขออนุญาติการก่อสร้างบ้านน็อคดาวน์
In this article
  1. Applying for a building permit for a knock-down house or knock-down unit
  2. Further points to know about applying for a building permit for a knock-down house:
  3. On exemption from building permits
  4. Frequently asked questions

In short: A knock-down house installed in place as a home or office, or above the size the law sets, needs a building permit (Form Or.1) like any other building. You apply at the district office in Bangkok, or at the municipality or subdistrict administration (OrBorTor) elsewhere, and the authority must decide within 45 days of a complete application. Some very small works may be exempt, but the local authority decides, so ask before you order.

Read more: container house law you should know / what a knock-down house is

Applying for a building permit for a knock-down house or knock-down unit

Many people looking for a knock-down house, a knock-down unit or prefabricated staff housing have an important question before deciding:

“If a knock-down house is brought in and installed on site, does it need a building permit?”

Because a knock-down house can be produced in a factory and installed on site quickly, many people understand it as just a “unit” or a structure that can be placed on land without any paperwork. In reality, whether a permit is required is not decided only by whether the building is knock-down or movable. It also depends on how it is installed, how it is used, its structure, and the judgement of the local authority in that area.

So if you are planning to install a knock-down house, worker housing, staff housing, an office unit, a prefabricated office or a modular building, one thing you should not overlook is the law and building permits.

Applying for a building permit is an important step under the Building Control Act B.E. 2522 (1979) and its amendments. Its purpose is to make sure that the construction and installation of buildings is safe and complies with requirements on town planning, setbacks, open space, land use and the rules of the local authority

1. Is a permit required? (for prefabricated housing)

In general, prefabricated buildings, knock-down houses, or shipping containers used as a residence/office and installed permanently in place, or of a size large enough as specified by law, must apply for a building permit (Form Or.1), just like building a conventional building.

Exceptions: Very small construction, or alterations that do not affect the main structure and do not exceed the specified area (for example, extending/reducing the area by no more than 5 square metres, or repairs that do not add more than 10% to the load), may be exempt. But to be sure, you should always consult the local official first.

2. Where to submit the application

The permit application must be submitted to the local official in the area where the building is located:

  • Bangkok: the district office (Public Works section)
  • Other provinces: the municipality or the Subdistrict Administrative Organization (SAO)

Today many areas have started offering online permit applications through the local authority's system, such as the Bangkok Metropolitan Administration's BMA OSS system

3. Key documents to prepare

The supporting documents used to apply for a building permit (Form Or.1) are generally as follows:

1. Applicant/land information

  1. Permit application form (Form Kor.1)
  2. Copy of the applicant's ID card and copy of the applicant's house registration
  3. Copy of the land title deed (copied at original size and certified as a true copy)
  4. Letter of consent from the landowner (if the applicant is not the landowner)

2. Plans and design work

  1. Plans and construction specifications (site plan, elevations, sections, structural details) in the number of sets required by the authority (e.g. 3-5 sets)
  2. Calculations, 1 set (if the building is large or has a structure that falls under control by the Engineer Act)
  3. Wastewater treatment system design (according to the standards of the Department of Public Works and Town and Country Planning or others)

3. Persons responsible for the work

  1. Certificates of the licensed engineering and architecture professionals (with copies of their ID cards), certifying them as designer/supervisor of the work
  2. Letter of consent of the work supervisor (Form Nor.4)

4. Summary of the procedure

  1. Prepare documents and plans: Hire an architect/engineer to design the prefabricated house in compliance with building control law (e.g. setbacks, height, openings, utility systems)
  2. Submit the application: Submit all documents to the local official in the area, or submit through the online system
  3. Review by the official: The official will check that the plans and documents are correct. If there are deficiencies, the applicant will be notified to correct them
  4. Issue of the permit: When the plans and documents are correct and complete under the law, the local official will issue the building permit (Form Or.1)
    • Review period: The law requires the review and the issue of the permit/notice of refusal within 45 days from the date a correct and complete application is received

Further points to know about applying for a building permit for a knock-down house:

  • Laws and local regulations: Check the information with the local authority, as it may differ
  • Plans: Choose certified plans for safety
  • Manufacturer or contractor: Choose one that is reliable

On exemption from building permits

  • Small controlled buildings: Whether they are exempt depends on size, use and local regulations. The local official is the one who decides, so always ask before ordering
  • Design: Some types of small buildings may not require an architect or engineer to certify the plans. Ask the local official about this as well

Frequently asked questions

Does a knock-down house need a building permit?

Yes, if it is installed in place as a home or office, or is above the size the law sets. Some very small works may be exempt, but the local authority makes that call.

Where do I apply, and how long does it take?

In Bangkok, at the district office (public works section); elsewhere, at the municipality or OrBorTor. Some areas accept online applications, such as Bangkok's BMA OSS. By law the authority must decide within 45 days of receiving a complete application.

What documents do I need?

The application form, copies of your ID card and house registration, a copy of the land title deed, the plans, and certificates for the designer and the site supervisor. Container To Build can help prepare the plans and supporting documents (for a fee).

Products related to this article

See all Resort & knock-down houses →

Showroom

A purchase of around 100,000 baht — see the real thing first.

We would love to show you around the showroom: open the doors, compare models side by side, then decide.

Related articles

View all →

Around 100,000 baht — see the real thing at our showroom before you decide

Tell us the model, quantity and site — we send a quotation right away, and we are happy to book a visit so you can open the doors and compare models in person.

Mon – Sat, 8:30 – 17:30 (closed Sundays and public holidays)